Installation is very simple and quick with minimal disruption. Narrow trenches need to be excavated (30cm) with immediate back-filling as each Hydrorock Aquifer Block is installed.

The blocks are very light and capable of being lifted and installed with ease by one man. No specialist installation engineering or equipment is required, with simple snap-together fittings, no special skills or tools are needed.

For more information on installation download our technical datasheets for each system.