Hydrorock Project Advisory Service
We are now offering a new Project Advisory Service. This comprises of a free Feasibility Study outlining your project evaluation and design, followed by a Detailed Design that provides a calculation and system design.

Feasibility Study
Provides:
- Confirmation of feasibility
- System Design (Outline Assumptions & Parameters)
- System Details (Outline System Make-up / Plan & Cross-section)
- System Performance Data (Indicative Calculations)
- Cost (Outline Estimates):
- Product (Hydrorock Blocks & Ancillaries)
- Fully Installed (inc. Plant, Labour, Materials, Excavation, Spoil, TM etc)
- Whole of Life (FIC plus Operation / recyling etc)
- Installation Timing (Outline Estimates)
- Project Total Value Proposition (All Project Benefits)
- Project
- Cost
- Environment
- Project Risk
- HSE
Required Project Information:
- Client Name / Project Name
- Location / Site Plan (Streetview)
- Project Stage
- Project Outline Brief (Scale / Objective / Timing)
- Project Description (Situation / Problem)
- Project Timings (Commencement / Completion)
- Traffic Management
- Broader Construction Scheme
View our sample Feasibility Study Documents Here:
(Parts of these documents have been redacted for client discretion)
Hydrorock System Detailed Design
Provides:
- System Design (Detailed Assumptions & Parameters)
- System Details (Detailed System Make-up / Plan & Cross-section)
- System Performance (Detailed Calculations)
- Cost (Indicative Estimates):
- Product (Hydrorock)
- Fully Installed (Plant, Labour, Materials, Excavation, Spoil, TM etc)
- Whole of Life (FIC plus Operation / Maintenance / EOL etc)
- Installation Timing (Indicative Estimates)
- Project Total Value Proposition (Hydrorock use Benefits)
- Project
- Cost
- Environment
- Project Risk
- HSE
Required Project Information:
- Client Name / Project Name
- Location / Site Plan (Streetview)
- Project Stage
- Project Outline Brief (Scale / Objective / Timing)
- Project Description (Situation / Problem)
- Project Timings (Commencement / Completion)
- Traffic Management
- Broader Construction Scheme
Required Site Information:
- TOPO
- Services Report
- Soil Permeability
- Ground make-up
- Water Table
- Catchment Area
- Water Volumes / Flow Rates