Persistent highway flooding solved with multiple dispersed Hydrorock modules
Lizard Lane is a busy link road connecting the Whitburn and Marsden areas of South Tyneside. Frequent heavy rain and clay soil led to the carriageway remaining flooded for long periods, even after the rain had stopped.
This posed a danger to pedestrians, drivers and other road users and was especially disruptive on a stretch of the highway passing the golf club and riding school. Surface water would run off the golf course and adjoining horse paddocks and onto the sloping road; overwhelming the inadequate drainage.
The lack of space in the verge and complications from other services underground required flexibility in the design as well as a more effective drainage system.
Lee Sergeant of South Tyneside Council explains the problem with the project site.
Hydrorock’s installation at Lizard Lane
Hydrorock SuDS are quick and easy to install. The flexibility of this solution enables rapid installation and resolution, minimising the chance of project overrun.
Hydrorock also has a high safety performance level due to being light weight and easy to transport. Being a smaller and more efficient solution means Hydrorock requires fewer vehicle movements, simplifying work activities and coordination.
Key Characteristics – select for more information
Lee shares his views on the use of Hydrorock for this project.
System design brief
The verges and footpath alongside the road are not very wide and there are several other services, both underground and above ground, that any excavation and drainage installation had to safely work around. Ground penetrating radar studies also showed an uneven bedrock requiring changes of level in the installation.
In addition, the drainage scheme had to integrate with improved traffic calming measures on what is a busy link road with frequent incidents between speeding vehicles and pedestrians or horse riders.
The solution
Super gullies – large capacity concrete kerbside collection chambers – were installed to rapidly clear the surface water from the road and direct it to the Hydrorock modules for buffering and infiltration. Four such modules were arrayed along the length of the project site underneath the roadside footpath and verge.
The two site plan drawings below (© Lynas Engineers Limited) show the road in the middle with the other services in different colours already in the verge. At the bottom of each drawing is the underlying bedrock profile and slope. The placement of the Hydrorock modules A-D are shown in dark blue. As can be seen, module B had to be split and connected around a power-line pole.
[Select image to enlarge]
Modules | A | B | C | D | TOTAL |
---|---|---|---|---|---|
Number of blocks | 180 | 180 | 90 | 120 | 570 |
Infiltration volume m3 | 96 | 96 | 48 | 64 | 304 |
Installing a combined total of 570 of Hydrorock’s largest standard density buffering and drainage blocks, gave a total infiltration volume of 304 m3 – a volume equivalent to around three London buses full of water.
Hydrorock benefits
By working with Hydrorock Solutions, Lynas Engineers and the contractor BCE Northern were able to design and install a viable solution for South Tyneside Council that:
Fits in a narrow site
Is flexible to adapt to changing levels and immovable obstacles
Removes water from the road surface quickly
Installs quickly to reduce the cost of road closures
Enables easier long-term maintenance
Works in harmony with traffic calming measures
System used
To provide a Sustainable Drainage System (SuDS) solution that harvests and buffers the rainwater and runoff, before infiltrating within the confines of the site, our Hydrorock Aquifer Water Infiltration System was installed.
Each block is lifted into place and connected to the block behind with a simple push-fit connector. Once a whole width of blocks has been installed, back-filling can begin immediately – in this case with a gravel mesh and shingle, for extra load bearing, prior to the topsoil.
The ends of each module were then connected to the kerbside gullies with the middle block of three being connected to a breather vent. As the Hydrorock module fills with water, the air is expelled through these breather pipes and as the water is released into the soil, air is drawn back in.
Project Downloads
Our project case studies are live, interactive documents and subject to regular updates, but if you need a printable version you can download our case studies and system datasheets in PDF format.
Get in touch with Hydrorock Solutions
Our team will help you find an effective, sustainable water management system for your project. We support you from design right through to installation.
Contact Details
Hydrorock Solutions Ltd
Leggswood House
Frittenden
Kent
TN17 2DB